PT Sinar Alam Cakrabuana provides Mechanical, Electrical & Plumbing (MEP) services for building utilities and industrial facilities. Each scope is aligned with the requirements of new installations, system upgrades, and reliable facility operations.

Mechanical, Electrical & Plumbing work by PT Sinar Alam Cakrabuana

MEP Scope of Work

Mechanical

  • Mechanical system and industrial machinery installation.
  • HVAC systems, including chillers, cooling towers, AHU/FCU, ducting, ventilation, and exhaust.
  • Industrial process piping, boiler and steam systems, compressed air systems, and utility piping.

Electrical

  • Medium- and low-voltage power distribution, including panels, transformers, switchgear, and backup generators.
  • Power and control cabling with cable trays and ladders.
  • Industrial automation, PLC/SCADA, industrial lighting, lightning protection, and grounding.

Plumbing

  • Industrial clean-water distribution networks and pumping systems.
  • Wastewater and stormwater drainage as well as water recycling systems.
  • Water Treatment Plant (WTP) and Wastewater Treatment Plant (WWTP) installation.

Fire Protection

  • Fire hydrant, automatic sprinkler, and fire alarm systems.
  • Fire suppression systems based on project requirements.
  • Testing, commissioning, inspection, and scheduled maintenance when included in the project scope.

Engineering & Execution Capabilities

Depending on the project scope, MEP execution may include engineering and design, procurement, fabrication, installation, inspection, testing, and commissioning. QA/QC processes support material verification and system testing before handover.

Industrial Applications

SAC’s MEP services support manufacturing plants, food & beverage facilities, warehouses, commercial buildings, industrial utilities, and production facilities. Each scope is adapted to the technical and operational requirements of the facility.

Selected Project Experience

Factory HVAC System Installation

For a production facility project in West Java, SAC carried out the design, fabrication, installation, testing, and commissioning of an HVAC system. The published scope includes a 500 TR Water-Cooled Chiller, Cooling Tower, AHU/FCU, ducting, chilled water piping, industrial exhaust and ventilation, and system-wide Testing, Adjusting, and Balancing (TAB).

The published project page is currently available in Indonesian only.

Quality & Safety

Project execution is supported by quality and occupational safety commitments guided by ISO 9001:2015 and ISO 45001:2018. SAC’s HSE programs include proactive monitoring, hazard reporting, routine inspections, technical training, and site supervision.

Discuss Your MEP Project Requirements

Share your system, facility, or work-scope requirements with the SAC team for further discussion.

Chat With Us